Stone Sizing Criteria for Riprap | CPDFormula by learnformula
About this course
CPA Newfoundland & LabradorCPA AlbertaCPA British ColumbiaCPA ManitobaCPA New BrunswickCPA Nova Scotia
CPA Ontario
CPA Prince Edward Island
CPA Saskatchewan
CPA Quebec Order
Many channel protection techniques involve rock or stone as a stand-alone treatment or as a component of an integrated system. Stone used as riprap can also be a component of many streambank soil bioengineering projects. Many Federal and state agencies have developed methods and approaches for sizing riprap, and several of those techniques are briefly described in this course.
Stone sizing methods are normally developed for a specific application, so care should be exercised in matching the selected method with the intended use. While many of these were developed for application with stone riprap revetments, they are also applicable for other designs involving rock, as well.
Topics:
Basic concepts
Description of forces on a stone
Flow conditions
Sizing techniques
Summary guide of selected techniques
Factor of safety
Example calculations
This course includes:
schedule1 hour on-demand content
signal_cellular_altBeginner level
task_altNo preparation required
calendar_todayPublished At Apr 28, 2022
workspace_premiumCertificate of completion
errorNo prerequisites
lock1 year access
calendar_todayUpdated At May 3, 2022
Browse course content
1 Text Lessons|1 Quizzes
Section 1
Student's Handout
Section 2
SIZ Quiz
Stone Sizing Criteria for Riprap
Intended for Hydraulic, River, Geotechnical, Civil, Environmental, Water Resources, and other engineers whose job description requires a knowledge of riprap and design procedures.